To show how fast and easy it is to build using
HSP precast components, we're giving you step-by-step
instructions for installing HSP planks.
Click any of the links below to see an
instructional slide-show for each step in the
construction process.
For those of you with Real Player 8, we've
also included a video of our plank production
using the Spancrete machine. Don't forget to
check it out!
Installing HSP Plank
Step 1: Handling and Setting Plank
HSP plank must be shipped, lifted, and handled properly
to ensure good results. Click here for instructions on
handling and setting HSP plank.
Step 2: Leveling and Grouting
After plank is installed, the planks must be leveled out and the keyways
must be filled with grout. Click here for leveling and grouting instructions.
Step 3: Concrete Topping
After installing, leveling and grouting, the plank is now ready for a structural concrete
topping. Here are instructions to develop a proper bond between the planks and topping.
Step 4: Finishing Floors
In buildings having HSP floors, pad and carpet can be installed
quickly and inexpensively. Tips and instructions are given here.
Step 5: Finishing Ceilings
Attractive ceilings are easy with Hanson Spancrete. Click here to find out how easy it is.
|
Pictures
Would you like to see HSP in action?
Click here
for pictures of current projects!
Engineering Data Handbook
Want more product information?
Visit our products
page, or click
here to request an Engineering Data
Handbook, filled with design information,
approvals, specifications, and more!
Bid Requests
Interested in a bid for an upcoming project?
Click here
to contact HSP and tell us about your project!
|